| Through the Hatch! |
| Original Kitchen |
| A slight improvement! |
| The Funky End |
| Family Room and Kitchen |
| More formal Dining End (there are some lights hiding in that wall!!) |
| Most of the Splash back! Bit on the left missing |
| New French Doors and my re-upholstered chairs |
| Cloak Room |
| Cloak room |
| New Internal Doors (skirting not all finished yet) |
| One on the right is my 'Kettle', it does filtered water too |
| Looks Good But see below! |
| Nice Big Shower for the Boys and Guests |
| Feature Tiles above the Bath |
1: we fork out another £1500 for a pressurised (i.e. mains fed) system and sell our brand new £300 shower pump 2nd hand
2: We replace all the new taps which cost us around £500
3: We have the taps connected to our pump which does risk our tank emptying too quickly if we don't stagger our use.
Great, so we are opting for 3 at the moment, which actually shouldn't be a problem except maybe when we have guests. Basically all parties blame each other for this, so my best advice is check and double check before you buy your fittings!
The ensuite and master bed are due for completion in the next 10 days so watch out for further updates. Thanks for reading.